Design-build for an active Animal Research Facility

Wakefield, MA – Building Automation Systems recently completed a design-build project for an active research laboratory studying mice. The client had issues with their existing HVAC system maintaining temperature, humidity, and outside air ventilation setpoints that are optimum for the resident mice. To improve system operation, BAS’s project scope entailed a full engineering study, energy…

Read More