Design-build for an active Animal Research Facility

Wakefield, MA – Building Automation Systems recently completed a design-build project for an active research laboratory studying mice. The client had issues with their existing HVAC system maintaining temperature, humidity, and outside air ventilation setpoints that are optimum for the resident mice. To improve system operation, BAS’s project scope entailed a full engineering study, energy…

Read More

RTU Design-Build Replacement Time-lapse

RTU Replacement Design-Build: Over one weekend, the BAS team installed a new 493 ton Seasons-4 roof top unit (RTU)  to replace an outdated Tempmaster RTU.  The new RTU was designed for exact alignment with the existing unit’s footprint.  The Seasons-4 unit alignment accounted for all of the old unit’s gas, chilled water, electric power, and…

Read More